1. Home
  2. »
  3. Projects

Projects

Over two decades of delivering excellence across Mauritius and beyond

Projects Completed
0 +
Years of Experience
0 +
Industry Sectors
0
Client Satisfaction
0 %

Soil Suitability Report for Proposed PDS Development

La Gaulette

A comprehensive assessment of site soil conditions to determine suitability for the proposed Property Development Scheme (PDS). Evaluating geotechnical characteristics, drainage, bearing capacity, and potential constraints to provide essential information to support planning, design, regulatory approvals, and sustainable development.

Remediation Methodology Report for Jet-A1 Spill

Plaine Magnien

Services include comprehensive site survey, trial pit excavation, soil testing, soil treatment implementation, and site reinstatement.

Outline Planning Permission for proposed 4 MWac Agri-Solar PV Farm with BESS

Gros Cailloux

The project involves securing outline planning permission for the development of a 4 MWac agricultural solar photovoltaic (PV) farm integrated with a Battery Energy Storage System (BESS). This project combines renewable energy generation with continued agricultural land use, enabling dual-purpose land management (agri-solar).

Outline Planning Permission and Environmental Impact Assessment for a 5000 Tonne/Year Composting Facility

Bras D’Eau

Outline planning permission and Environmental Impact Assessment for a 5,000 tonne/year composting facility to process organic waste sustainably. This report focuses on environmental compliance, odour control, and efficient conversion of waste into valuable compost products.

Environmental Impact Assessment and Land Conversion Permit for a PV Farm of Capacity of 3,216 kWp

Plaine des Papayes

Environmental Impact Assessment (EIA) and Land Conversion Permit (LCP) for a 3,216 kWp photovoltaic (PV) farm evaluating the environmental and land-use implications of converting land for solar energy generation. It ensures that potential impacts are mitigated while supporting sustainable renewable energy development and compliance with regulatory requirements.

Land Conversion Permit application and Land Drainage Impact Assessment for a PV Farm of Capacity of 1980 kWp

Arsenal

Land Conversion Permit application and Land Drainage Impact Assessment for a PV Farm of 1980 kWp evaluating the suitability of converting land for solar development while assessing potential impacts on surface water and drainage patterns.