-
- Strategic Environment Assessment Report for Constance Smart City Company Ltd
- Environmental Impact Assessment Report for the Commercial and Recreational Development at Constance Flacq
-
- Environmental Impact Assessment Report for a PV Farm of Capacity of 3,216 kWp at Plaines des Papayes by Green Yellow Construction (Mauritius) Ltd
- Consultancy Services for the Preparation of Baseline Ecology and Draft Strategic Environment Assessment Report at Wolmar, Flic en Flac by Medine Limited
- Environmental Impact Assessment Report (EIA) For Installation of a Candock Floating Pontoon at Grand Baie by Sea Blue Mountain Ltd
- Preliminary Environmental Report for a Foundry Project at Khoyratty by H. Ennergeet Company Ltd
- Environmental Impact Assessment Report for the Proposed Development of 2 Upper Bocks of G+2 Floors and 2 Lower Blocks of G+1 Floor by Salty Bay Mauritius Ltd
- Environmental Impact Assessment (EIA) Report for the Proposed 15 MWac Solar PV Project at Le Val by Cluny Solar Ltd
- Environmental Impact Assessment Report for the Installation of a Floating Pontoon on Ruisseau Cresson by Societe Civil Mavasa
- Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Decommissioning of the Medine Sugar Milling Co. Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Queen Victoria by Green Yellow Construction Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Arsenal by Green Yellow Construction Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1971 kWp at Arsenal by Green Yellow Construction Ltd
- Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Proposed Construction of Bain Boeuf Apartment of 84 keys at Bain Boeuf in the district of Riviére du Rempart by Serenity Future Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1188 kWp at Solitude by Green Yellow Construction Ltd
- Environmental Monitoring Plan (EMP) / Environmental Monitoring Reports (EMR) for Construction of La Pirogue Residences at Wolmar, Flic en Flac by La Pirogue Residences Ltd
- Preparation of Preliminary Environmental Report (PER) for proposed Plant for The Manufacture of Fibre Optics Cable at Pailles by Aksh Technologies Mauritius Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a Floating Pontoon on Ruisseau Cresson at Black River by D.Baznath
-
- Environmental Impact Assessment Report (EIA), Land Conversion Permit (LCP) and Land Drainage Impact Assessment (LDIA) for the Proposed 16 MW Solar PV Farm Project at Petit Riviere by Tianli Spinning (Mauritius) Co Ltd
- Preparation of report for Variation to Environmental Impact Assessment License and Land Conversion Permit at Arsenal by Green yellow
- Environmental Impact Assessment Report (EIA) for the Proposed Battery Anode Facility at Mer Rouge by NextSource CSPG (Mauritius) Ltd
- Consultancy Services to facilitate Waiver of Environmental Impact Assessment License for 2.5 MWP Solar PV Project at Fond du Sac by Axian Energy Green
- Environmental Impact Assessment Report (EIA) and Environmental Monitoring Plan (EMP) Reports for the Proposed Project Magenta Parkside Phrase 2 by Medine Group/Property, Mauritius
- Environmental and Social Impact Assessment Report (ESIA) for the 30 MWac Solar PV Farm with BESS at Mare D’Australia by SPV 30MW Belle Vue 3 Ltd
- Environmental and Social Impact Assessment Report (ESIA) for the 30 MWac Solar PV Farm with BESS at Amaury by SPV 30MW Belle Vue 2 Ltd
- Environmental and Social Impact Assessment Report (ESIA) for the 10 MWac Solar PV Farm with BESS at Plaines des Papayes by SPV10MW Belle Vue 1
- Environmental Impact Assessment Report (EIA) including Land Drainage Impact Assessment (LDIA) Reports for the proposed Project Belle Vue 3 of 30MWac Solar PV Farm at Mare D’Australia
- Environmental Impact Assessment Report (EIA) including Land Drainage Impact Assessment (LDIA) Reports for the proposed Project Belle Vue 2 of 30MWac Solar PV Farm at Amaury by SPV 30MW Belle Vue 2 Ltd
- Environmental Impact Assessment Report (EIA) for proposed 10MWac Solar PV Farm Projects at Bon Air, Plaines des Papayes by SPV10MW Belle Vue 1
- Environmental and Social Impact Assessment Report (ESIA) for the 30 MW Solar PV Farm with BESS at Trou D’eau Douce by Stor’Sun 1 Ltd
- Environmental and Social Impact Assessment Report (ESIA) for a 10 MW Solar PV Farm with BESS at Trou D’eau Douce by Stor’Sun 2 Ltd
- Environmental and Social Impact Assessment Report (ESIA) for a 10 MW Solar PV Farm with BESS at Arsenal (Massilla) by Stor’Sun 3 Ltd
- Environmental and Social Impact Assessment Report (ESIA) for a 10 MW Solar PV Farm with BESS at Petit Verger (Circonstance) by Stor’Sun 4 Ltd
- Environmental Monitoring Plan and Environmental Monitoring Reports for a 10MW PV Farm Project at Petite Retraite by GreenRock Ltd
- Environmental Monitoring Plan and Environmental Monitoring Reports for a 1MW PV Farm Project in Rodrigues by Corexsolar International (Mauritius) Ltd
-
- Environmental Impact Assessment Report (EIA) for the Installation of a 30 MW Solar PV Farm with Battery Energy Storage System (BESS) at Trou D’eau Douce by Stor’Sun 1 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Trou D’eau Douce by Stor’Sun 2 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Arsenal (Massilla) by Stor’Sun 3 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Petit Verger (Circonstance) by Stor’Sun 4 Ltd
- Environment Impact Assessment & Environment Monitoring Plan for the Construction of Cascavelle Hospital Ltd c/o Medine Ltd
- Gap Analysis between IFC PS and Mauritian Legal Framework in relation to PV Projects
- Environment Management & Monitoring for Wind farm Project
- Consultancy services for Facilitation and Negotiation to remove or limit Medine LTD’s liability in connection with lava tunnels under VRS Morcellement at Palma
- Environmental Impact Assessment Report for the proposed 26 keys Tamarina Golf Lodges Project
- Environmental Impact Assessment (EIA) for proposed 15MW Solar PV Power Projects at Le Val
- Environmental Impact Assessment for an Asphalt Plant at L’Aventure by Eastern Stone Crusher Ltd
- Environmental Impact Assessment (EIA) for proposed 15MW Solar PV Power Projects at Le Val
- Environmental Impact Assessment (EIA) for the construction of Moka Eye Hospital
- Preliminary Environmental for the Installation of a Containerised Paint Recycling Plant at Petit Verger
- Environmental Impact Assessment (EIA) for Setting up of 2.0 MWP Floating PV Plant at Tamarind Falls Reservoir, Mauritius
- Environmental Impact Assessment (EIA) for the setting up of a Solar Farm of 10 MW Arsenal
- Environmental Impact Assessment (EIA) for the Construction of La Pirogue Residences at Wolmar Flic-en Flac
- Environmental Impact for the Setting up of an Oxygen Manufacturing Plant at Petit Verger
- MCCI Roadmap for Waste Plastic Free Mauritius
-
- ENL Group Waste Management Strategy for Inter-Company Industrial Symbiosis
- Environment Health and Safety Audit for ABE Industrial Products (IO) Ltd
-
- Independent Environmental and Social Review of the Merville Ltd 5* Hotel Project by LUX
- Environment Management & Monitoring for JinFei Eden Development Company Ltd
- Environmental Impact Assessment (EIA) for Installation of Two Candock Floating Pontoons at the Waterclub PDS situated at La Balise Marina
- Environmental Impact Assessment (EIA) for a Stone Crusher Ltd, including Block Making, Ready Mix, Asphalt Plant at Chamouny
- Environmental Impact Assessment (EIA) for Eastern Stone Crusher Ltd at Fond du Sac
- Environmental Compliance Review Report for Ocean Grand Gaube Apartment Complex
- Environment Impact Assessment for the Construction of Bain Boeuf Apartments of 84 Keys at Bain Boeuf
-
- Construction Environmental Management Plan (CEMP) at Beau Plan Smart City
- Preliminary Environment Reports (PER) for Proposed Manufacture of Medical Plastic Tubings
- Environment Management and Monitoring for the Proposed Photovoltaic Solar Farm project of 4.88 MW AC at Petite Riviere
- Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Decommissioning of the Medine Sugar Milling Co. Ltd
- Environmental Impact Assessment Reports(EIA) / Preliminary Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd
- Environment Management & Monitoring for the Construction of the Public Aquarium of Port Louis at Les Salines
- Environment Management & Monitoring for Wind farm Project at Plaines des Roches
- Consultancy Services for the Implementation of an Environment Management System Certifiable to ISO 14001:2015 at Princes Tuna (Mauritius) Ltd
- Licences and Permits for the Operation of a 135 Keys Serviced Senior Residence/Tourist Residence at Grand Baie by the AEGIDE Group
- Consultancy Services for the Preparation of Environmental and Social Impact Assessment (ESIA) for a Seismic Survey
-
- Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile Mangenie
- Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready-Mix Concrete at Alma
- Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready-Mix Concrete at a New Plant in Geoffroy
- Consultancy Services for the Preparation of Environmental Impact Assessment Report for 250 Keys Hotel at Petite Riviere Noire
- Environmental Management and Monitoring Plan in connection with Design and Build/ Turnkey Project for the Construction of a Grade Separated Junction on the Motorway M1 at Deschartes Street and other upgrading works
- Preliminary Environment Reports (PER) for Proposed Plant for the Manufacturing of Fibre Optic Cable
-
- Environmental Impact Assessment Reports(EIA) / Preliminary Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd
- Preliminary Environmental Report for the Proposed Green Tea Factory at Dubreuil
- Environmental Impact Assessment Report for the Proposed Project for Steam Production from Treated Used Cooking Oil by Avantime Ltd
- Preparation of an Environmental Impact Assessment Report for the Proposed 185 Keys Hotel at Baie Du Tombeau by Mauritius Jin Fei Economic Trade and Cooperation Zone Co Ltd
- Preparation of a report to seek clearances for Artisanal Farming of Crabs at Barachois Anse Bambous
- Environmental Impact Assessment Report for the Proposed Photovoltaic Solar Farm project of 4.88 MW Ac at Petite Riviere
- Environmental Impact Assessment for the Proposed Photovoltaic Plant of 12.24 MW at Queen Victoria Solar Farm
-
- Environmental Impact Assessment for the Setting up of an Oyster Farm at Sud Pointe Grande Passe By Mascareignas Oysters (Mauritius) ltd
- Preliminary Environmental Report for a Concrete Batching Plant and Lean Mix Batching Plant
- Environmental Monitoring Report for the Construction of a New Airport Access Road to SSR International Airport
- Environmental Audit Report for site Inspection and Remedial Measures to contain Rainwater Run – off at the Premixed Concrete plant of Bambous
-
- Environmental Impact Assessment for Proposed Project “Paille De Canne de Cogénération” at Terragen Ltd
- Environmental Management and Monitoring Services in connection with the replacement of Boilers and Upgrade of Electricity Co- generation
- Environmental Impact Assessment Report for the Proposed Project for the Construction of a Mixed-Use Building
- Environment Monitoring and Management Plan at Mauritius Container Terminal Project Site
- Social Consultations and Preparation of Social Programme for Investment for an IRS Project by Mont Choisy Property Development Ltd
-
- Environmental Management and Monitoring Services during Construction of the 17.85 MW Wind Farm by EOLE de Plaine des Roches
- Preliminary Environmental Report (PER) for Proposed Construction of New Island Brush Factory at Saint Antoine, Goodlands
- Implementation of Environment Management System (EMS) ISO 14001: 2004 for Innodis Ltd at Beau Climat
- Consultancy Services for the Setting Up of a Vehicle Examination Station at Laventure
- Review Compliance to Equator Principles, IFC’s EHS Guidelines and IFC’s Performance Standards on Environmental and Social Sustainability for the Proposed Wind Farm Project at Plaine Sophie
- Preparation of EIA Report and BLUP in connection with the replacement of Boilers and Upgrade of Electricity Co- generation by Medine Sugar Milling Company Ltd
-
- Environmental Monitoring Plant for 14 Wind Turbines at Plaine Sophie
- Preparation of an amendment to the Environment Impact Assessment license for the Construction and Operation of a Wind Farm at Plaine des Roches
- Application for Water resources Unit Clearance for Proposed Real Estate Project at Black River by Turnkey Management Ltd
- Preliminary Environmental Report and Public Consultation Report for Proposed Installation of a Temporary Semi-Mobile Ready-Mix Concrete Batching Plant at Alma by Pre-Mixed Concrete Ltd
-
- Environment Impact Assessment Report for Proposed Project for the Setting up of a Pyrolysis Plant for Recycling Scrap Tyre/Rubber and Plastic at Nouvelle France by Sujoy Vishnu Enterprise (Mtius) Ltd
- Environment Impact Assessment Report for Proposed Stone Crushing and Block Making Plant at Fond du Sac by Eastern Stone Crusher Ltd
- Environment Impact Assessment & Traffic Impact Assessment Reports for the proposed Vehicle Examination Station at L’Aventure
- Environment Impact Assessment & Traffic Impact Assessment Reports for the proposed Vehicle Examination Station at Forest Side
-
- Environment Impact Assessment & Traffic Impact Assessment Reports for Neotown Les Salines Development Ltd
- Consultancy Services for Energy Efficiency in Moroccan Manufacturing Sector
- Modelling of Environmental impacts for 18 MW Wind Farm by Aerowatt
-
- Environment Impact Assessment & Traffic Impact Assessment Reports for Neotown Les Salines Development Ltd
- Consultancy Services for Energy Efficiency in Moroccan Manufacturing Sector
- Modelling of Environmental impacts for 18 MW Wind Farm by Aerowatt
- Environmental Monitoring Services for the SSR International Airport Expansion Project by China State Construction Engineering Corporation
- Environment Impact Assessment for the Operation of an Existing Stone Crushing Plant and the Setting up of a Block Making Plant, a Bitumen Plant and a Concrete Mixing Plant by La Rocaille Ltee
- Environment Impact Assessment Report for the Installation of a medical waste incinerator at Jawaharlall Nehru Hospital in Rose Belle
- Energy Management Consultancy for energy savings in hotels in Mauritius by Enterprise Mauritius & AHRIM
- Energy Management Consultancy Services for Data Communications Ltd
- Energy Management Consultancy Services for Fit U Garment Ltd
- Energy Management Consultancy Services for Prest Plastics Ltd
- Energy Management Consultancy Services for Ramdenee Edible Oil Products Ltd
- Energy Management Consultancy Services for ABC Motors Co Ltd
-
- Environmental Impact Assessment report for the construction of a beach hotel in Rodrigues, including desalination wastewater systems by Var Investment Ltd.
- Evaluation of the Grand scheme, product standards and advice of on how to further increase the usage of SWH in Mauritius by Ministry of Renewable Energy and Public Utilities under the authority of the United Nations Development program
- Energy Auditing and Project Management by Tee sun Co Ltd (Palmar Group)
- Energy Auditing and Project Management for energy efficiency by Apavou Hotels.
- Traffic count and preparation of TIA report by Indian Ocean Real Estate Company (IOREC)
- Energy Auditing and Project Management by Mauritius Commercial Bank Ltd (MCB)
- Environmental Impact Assessment Report for the Extension of Indian Resort & Spa for the Apavou Group by Apavou Hotels
-
- Market Study for the Implementation of a Food and Environmental Testing Laboratory by Intertek (Mauritius) Ltd by Intertek (Mauritius) Limited
- Implementation of ISO 22000 Standard by Constance Lemuria Resorts (Seychelles)
- Preparation of the Social Impact Assessment Report by Belle Riviere Estate
- Preparation of Site Environmental Audit Report by ACTIS Ltd (UK)
- Implementation of food safety procedures and systems by SOPHALCO Ltd
- Facilitate implementation of used oil re-refining facility, EIA licence by Star Ecoenergy Ltd
- Identify all eco-industries acting in Mauritius in the waste, water and energy sectors by Ernst & Young Ltd
-
- A system of data collection, processing, analysis and monitoring for the FAD fishery by FAD / Ministry of Agro-Industry and Fisheries
- Consultancy services for the implementation of a Quality Assurance System (ISO 9001:2000 Implementation) by SATIM (Mauritius)
- Assist in management of various environmental concerns at the Rose Belle Ethanol plant by Alcodis Ltd
- Consultancy services for the implementation of a Environmental Risk Management System (ISO 14001:2004 Implementation) by Alcodis Ltd
- Consultancy services for assistance to participate in the Environmental Reporting Award of the Ministry of Environment by Maurilait Production Ltee
- Assistance to TOTAL MAURITIUS in connection with environmental implications of fuel switching for industrial client sites by Total Mauritius Limited
- Environmental Impact Assessment for the operation of a beach hotel comprising of 39 rooms at Pointe aux Piments by Chilipoint Ltd
- Consultancy Services for the implementation of an Environmental Management System based on Green Globe 21 standard by One and Only Le Saint Geran Hotel
- Environmental Impact Assessment for the construction and operation of a beach restaurant attached to the Blue Ocean Park Hotel by Sagar Hotels & Resorts Ltd
- Environmental Impact Assessment for the creation of swimming zones and beach reprofiling in front of the Blue Ocean Park Hotel as well as the construction of a jetty, desalination wastewater systems by Sagar Hotels & Resorts Ltd
-
- Preliminary Environment Report for a textile knitting unit with 50 machines by Texpull Ltd
- Preliminary Environment Report for the renovation of a home for the elderly by Bonne Terre Home for the Elderly
- Preliminary Environment Report for a proposed bakery project at Tamarin by Peche Mignon Ltee
- Preliminary Environment Report for the complete renovation of the petroleum retail outlet at Curepipe by Caltex
- Consultancy Services for large scale composting of organic waste including un-segregated municipal solid waste in Mauritius including Preliminary Environment Report and Marketing Plan by Solid Waste Recycling Co Ltd
- Preliminary Environment Report for the construction of a residential complex at Bain Boeuf by Admiral Court Ltd (Gleeds Ltd)
- Preliminary Environmental Report for the proposed construction of 24 Housing Units at Curepipe by Paris Belle Epoque (Gleeds Ltd)
- Preliminary Environmental Report for proposed project for the setting up of an Art Glassmaking Factory & Shop at Trou aux Biches by Rocki Mtius Ltd
- Preliminary Environmental Report for the proposed petroleum retail outlet at La Vigie on the Motorway by Caltex
- Environmental Impact Assessment for the Production, Distribution, Combustion of Coal Water Slurry (CWS) including Post-Combustion Gas Cleaning by Avantime Ltd
-
- Determination of the status of Energy Efficiency and Energy Conservation in Buildings in the Republic of Mauritius by UNDP.
- System Audit with respect to ISO 14001:2004 by SITAM (Majunga)
- System Audit with respect to ISO 14001:2004 by SACIMEM (Antsirabe) at Madagascar.
- Environmental Impact Assessment for the construction of 83 housing units by Societe de l’Horizon
- Environmental Impact Assessment for the construction and operation of a clinic for hair grafting at Trou aux Biches by Challeng’hair Ltd
- Environmental Impact Assessment for a luxury housing project at Grand Bay by Super Construction Co. Ltd
- Environmental Impact Assessment for the construction of a residential complex of 82 Housing Units at Belle Rose by Les Entreprise Phi Ltee
- Environmental Impact Assessment for the proposed petroleum retail outlet at St Julien by Caltex (Mauritius) Ltd, St Julien
- Environmental Impact Assessment for the proposed petroleum retail outlet at Mare D’Australia by Caltex (Mauritius) Ltd, Mare D’Australia
- Feasibility and opportunity study of a new Pharmacy including survey of potential customers by Pharmacy Seegobin
-
- Preliminary Environment Reports for 7 petroleum retail outlets by Indian Oil (Mauritius) Ltd
- Consultancy services for the implementation of a Quality Assurance System (ISO 9001:2000 Implementation) by State Insurance Corporation Of Mauritius
- Project concept development and environmental planning for proposed Camp de Vacances in Rodrigues Island
- Strategic Environmental Assessment (SEA) of 3 production systems (potato, deer and palm) by Mauritius Chamber of Agriculture
- Gap Analysis and identification of Hazard Analysis Critical Control Points
- Benchmarking for Green Globe Certification by Le Prince Maurice
- Environmental Impact Assessment for proposed plant for the manufacture of Tile Adhesives by MMC International Ltd
-
- Survey of fishers and Economic/Environmental Impact Assessment of FAD technology by Ministry of Fisheries at Rodrigues
- Regional Biomass Assessment for six pacific islands and preparation of a strategy for biomass resource management by SOPAC (South Pacific Applied Geosciences Commission)
- Consultancy services for the implementation of a Quality Assurance System in the following branches: Mauritius Telecom Ltd, Cellplus Ltd, Telecom Plus Ltd, Teleservices Ltd, Mauritius Telecom (Rodrigues) Ltd
- Employee Skills Enhancement Project by Pad & Co. Ltd
- Development of an Environment Information System for the Ministry of Environment in association with SMEC by Ministry of Environment
-
- Feasibility and site identification together with Environmental Impact Identification for a Seaweed Farming in Rodrigues by Ministry of Fisheries.
- Consultancy services for the implementation of a Quality Assurance System (ISO 9001:2000 Implementation) by Prosimex Ltd / Unicorn Ltd / Alpha Cleaning Ltd
- Consultancy services for the implementation of an Environment Management System (ISO 14001:2004 Implementation) by Southern Textile Ltd
- Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
- Opportunities for domestic energy savings in Rodrigues – Impact of the introduction of CFLs by Rodrigues Council of Social Services
- Electrification of Agalega Island using Biofuels from Coconut by United Nations Development Programme
- Assessment of Bagasse Cogeneration in Mauritius by NEDO, Japan
-
- Consultancy services for implementation of an Environment Management System (ISO 14001:2004 Implementation) for Esquel Group (Textile Industries Ltd)
- Environmental planning and facilitation of licenses of a proposed 44 room hotel project in Rodrigues Island by Pleasure Bay Ltd
- Performed an Economic Impact Assessment of the Plaines Wilhems Sewerage Project by Montgomery Watson (UK)
- Consultancy services for the implementation of a Quality Assurance System (ISO 9001:2000 Implementation)
- Consultancy services for the implementation of an Environment Management System (ISO 14001:2004 Implementation) by Queenswear Ltd
- Feasibility for Bagasse utilisation in Cogeneration by National Renewables Energy Laboratory, USA
-
- Energy Management Framework at the Ferney Spinning Mills.
- Consultancy services for implementation of Environment Management System
- Consultancy services for implementation of Quality Assurance System
- Seminar on Solid Waste Management System for personnel & maintenance managers of over 20 beach resort hotels in Mauritius
- Consultancy services for implementation of a Quality Assurance System (ISO 9002:1994 Implementation) for Green Cross Medical Laboratory