2018
- Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile Mangenie
- Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready-Mix Concrete at Alma
- Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready-Mix Concrete at a New Plant in Geoffroy
- Consultancy Services for the Preparation of Environmental Impact Assessment Report for 250 Keys Hotel at Petite Riviere Noire
- Environmental Management and Monitoring Plan in connection with Design and Build/ Turnkey Project for the Construction of a Grade Separated Junction on the Motorway M1 at Deschartes Street and other upgrading works
- Preliminary Environment Reports (PER) for Proposed Plant for the Manufacturing of Fibre Optic Cable