- Environmental Impact Assessment Report (EIA) for the Installation of a 30 MW Solar PV Farm with Battery Energy Storage System (BESS) at Trou D’eau Douce by Stor’Sun 1 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Trou D’eau Douce by Stor’Sun 2 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Arsenal (Massilla) by Stor’Sun 3 Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a 10 MW Solar PV Farm with Battery Energy Storage System (BESS) at Petit Verger (Circonstance) by Stor’Sun 4 Ltd
- Environment Impact Assessment & Environment Monitoring Plan for the Construction of Cascavelle Hospital Ltd c/o Medine Ltd
- Gap Analysis between IFC PS and Mauritian Legal Framework in relation to PV Projects
- Environment Management & Monitoring for Wind farm Project
- Consultancy services for Facilitation and Negotiation to remove or limit Medine LTD’s liability in connection with lava tunnels under VRS Morcellement at Palma
- Environmental Impact Assessment Report for the proposed 26 keys Tamarina Golf Lodges Project
- Environmental Impact Assessment (EIA) for proposed 15MW Solar PV Power Projects at Le Val
- Environmental Impact Assessment for an Asphalt Plant at L’Aventure by Eastern Stone Crusher Ltd
- Environmental Impact Assessment (EIA) for proposed 15MW Solar PV Power Projects at Le Val
- Environmental Impact Assessment (EIA) for the construction of Moka Eye Hospital
- Preliminary Environmental for the Installation of a Containerised Paint Recycling Plant at Petit Verger
- Environmental Impact Assessment (EIA) for Setting up of 2.0 MWP Floating PV Plant at Tamarind Falls Reservoir, Mauritius
- Environmental Impact Assessment (EIA) for the setting up of a Solar Farm of 10 MW Arsenal
- Environmental Impact Assessment (EIA) for the Construction of La Pirogue Residences at Wolmar Flic-en Flac
- Environmental Impact for the Setting up of an Oxygen Manufacturing Plant at Petit Verger