2024

  • Environmental Impact Assessment Report for a PV Farm of Capacity of 3,216 kWp at Plaines des Papayes by Green Yellow Construction (Mauritius) Ltd
  • Consultancy Services for the Preparation of Baseline Ecology and Draft Strategic Environment Assessment Report at Wolmar, Flic en Flac by Medine Limited
  • Environmental Impact Assessment Report (EIA) For Installation of a Candock Floating Pontoon at Grand Baie by Sea Blue Mountain Ltd
  • Preliminary Environmental Report for a Foundry Project at Khoyratty by H. Ennergeet Company Ltd
  • Environmental Impact Assessment Report for the Proposed Development of 2 Upper Bocks of G+2 Floors and 2 Lower Blocks of G+1 Floor by Salty Bay Mauritius Ltd
  • Environmental Impact Assessment (EIA) Report for the Proposed 15 MWac Solar PV Project at Le Val by Cluny Solar Ltd
  • Environmental Impact Assessment Report for the Installation of a Floating Pontoon on Ruisseau Cresson by Societe Civil Mavasa
  • Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Decommissioning of the Medine Sugar Milling Co. Ltd
  • Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Queen Victoria by Green Yellow Construction Ltd
  • Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Arsenal by Green Yellow Construction Ltd
  • Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1971 kWp at Arsenal by Green Yellow Construction Ltd
  • Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Proposed Construction of Bain Boeuf Apartment of 84 keys at Bain Boeuf in the district of RiviĆ©re du Rempart by Serenity Future Ltd
  • Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1188 kWp at Solitude by Green Yellow Construction Ltd
  • Environmental Monitoring Plan (EMP) / Environmental Monitoring Reports (EMR) for Construction of La Pirogue Residences at Wolmar, Flic en Flac by La Pirogue Residences Ltd
  • Preparation of Preliminary Environmental Report (PER) for proposed Plant for The Manufacture of Fibre Optics Cable at Pailles by Aksh Technologies Mauritius Ltd
  • Environmental Impact Assessment Report (EIA) for the Installation of a Floating Pontoon on Ruisseau Cresson at Black River by D.Baznath