2024
- Environmental Impact Assessment Report for a PV Farm of Capacity of 3,216 kWp at Plaines des Papayes by Green Yellow Construction (Mauritius) Ltd
- Consultancy Services for the Preparation of Baseline Ecology and Draft Strategic Environment Assessment Report at Wolmar, Flic en Flac by Medine Limited
- Environmental Impact Assessment Report (EIA) For Installation of a Candock Floating Pontoon at Grand Baie by Sea Blue Mountain Ltd
- Preliminary Environmental Report for a Foundry Project at Khoyratty by H. Ennergeet Company Ltd
- Environmental Impact Assessment Report for the Proposed Development of 2 Upper Bocks of G+2 Floors and 2 Lower Blocks of G+1 Floor by Salty Bay Mauritius Ltd
- Environmental Impact Assessment (EIA) Report for the Proposed 15 MWac Solar PV Project at Le Val by Cluny Solar Ltd
- Environmental Impact Assessment Report for the Installation of a Floating Pontoon on Ruisseau Cresson by Societe Civil Mavasa
- Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Decommissioning of the Medine Sugar Milling Co. Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Queen Victoria by Green Yellow Construction Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1980 kWp at Arsenal by Green Yellow Construction Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1971 kWp at Arsenal by Green Yellow Construction Ltd
- Environmental Monitoring Plan (EMP)& Environmental Monitoring Reports (EMR) for the Proposed Construction of Bain Boeuf Apartment of 84 keys at Bain Boeuf in the district of RiviƩre du Rempart by Serenity Future Ltd
- Consultancy Services for Land Conversion Permit (LCP) Application and Land Drainage Impact Assessment (LDIA) Report for a PV Farm of Capacity of 1188 kWp at Solitude by Green Yellow Construction Ltd
- Environmental Monitoring Plan (EMP) / Environmental Monitoring Reports (EMR) for Construction of La Pirogue Residences at Wolmar, Flic en Flac by La Pirogue Residences Ltd
- Preparation of Preliminary Environmental Report (PER) for proposed Plant for The Manufacture of Fibre Optics Cable at Pailles by Aksh Technologies Mauritius Ltd
- Environmental Impact Assessment Report (EIA) for the Installation of a Floating Pontoon on Ruisseau Cresson at Black River by D.Baznath